DNV report on blowout preventer used at BP well

Here is the two-volume report by Det Norske Veritas on the blowout preventer that failed to stop gushing oil and gas at BP’s doomed Macondo well.

The federal government contracted DNV to put the blowout preventer through tests at a NASA facility in New Orleans.

DNV Report EP030842 for BOEMRE Volume I

DNV BOP report – Vol 2 (2)

SHOW MORE